H1B Report
H-1B sponsorGAFEIN 20-5757672WARN notices: 1Updated Aug 2026

Georgia-Pacific Gypsum LLC

US H-1B Labor Condition Application activity for Georgia-Pacific Gypsum LLC. Filed 36 disclosures between FY2011 and FY2024 from worksites with a GA headquarters indicator.

Total filings
4
Outside top-N · FY2024
Certified
75.0%
unconditional · FY2024
Withdrawn
0.0%
withdrawn rate · FY2024
Denied
0.0%
rejection rate · FY2024

H-1B outcome breakdown

Share of Georgia-Pacific Gypsum LLC’s LCAs by DOL case status, all fiscal years. Use the year filter above for a single-year breakdown.

Outcome breakdown: Certified 86.1%, Cert-withdrawn 8.3%, Denied 5.6%
Outcome breakdown
OutcomeShare
Certified86.1%
Cert-withdrawn8.3%
Denied5.6%
Certified86.1%
Cert-withdrawn8.3%
Denied5.6%

Top occupations sponsored

SOC codes filed most by Georgia-Pacific Gypsum LLC across all fiscal years. Click any row to open the national salary guide.

#SOCTitleFilings
117-2041Chemical Engineers15
217-2051Civil Engineers3
311-3051Industrial Production Managers2
417-2112Industrial Engineers2
517-2071Electrical Engineers2
611-3121Human Resources Managers1
711-9199Managers, All Other1
817-2081Environmental Engineers1
941-9031Sales Engineers1

H-1B filings by fiscal year

Year-over-year H-1B filing volume — a hiring-demand signal, not headcount.

YearFilings
FY20112
FY20131
FY20143
FY20152
FY20164
FY20175
FY20184
FY20195
FY20201
FY20213
FY20222
FY20244
Time series: 12 points from FY2011 to FY2024
Time series
PeriodValue
FY20112
FY20131
FY20143
FY20152
FY20164
FY20175
FY20184
FY20195
FY20201
FY20213
FY20222
FY20244

Workforce reductions (WARN notices)

Georgia-Pacific Gypsum LLC filed 1 WARN Act notice on record in the state disclosures this site tracks (TX), announcing planned reductions affecting approximately 158 workers. A notice is an announcement, not a completed layoff.

Notice dateLocationTypeWorkers affectedSource
2023-02-02Quanah, TX158Texas WARN(opens the state’s disclosure source)

How to read WARN notices

What is a WARN notice?
A WARN notice is an employer’s advance written announcement, filed with a state workforce agency, of a planned mass layoff or plant closing. The federal WARN Act generally requires 60 or more days of notice from larger employers, and several states add their own notice rules. The notice itself is a public record published by the state. The WARN Act, in the glossary.
Is a WARN notice the same as a completed layoff?
No. A WARN notice is an employer’s advance ANNOUNCEMENT of a planned mass layoff or closure, generally required 60 or more days ahead. Plans are sometimes rescinded, reduced, or rescheduled, and the headcount is the employer’s estimate at filing time.
Does no WARN notice mean no layoffs?
No. WARN generally covers larger employers (typically 100 or more employees) above event-size thresholds, state rules differ, and this site currently tracks a subset of state disclosure sources. Smaller or untracked reductions do not appear here. Which states are tracked.
Do these notices show H-1B workers replacing laid-off workers?
No, and the reverse cannot be concluded either. LCA filings and WARN notices are separate public records that may involve different divisions, worksites, job types, and time periods. This site presents both records side by side and draws no causal conclusion.
Does an H-1B filing mean a visa was granted?
No. A Labor Condition Application is the wage-and-worksite filing an employer makes before petitioning. Many certified LCAs never become petitions, and an LCA is not a visa. What an LCA is.
How do I report an error in the layoffs data?
Email hello@h1b.report with the employer name, the state, the notice date, and what looks wrong. Reports are reviewed by hand, verified corrections are applied with the next data refresh, and the matching rules are documented on the methodology page. How WARN data is matched and published.

Full detail: how this data is matched and published · disclaimer · WARN terms in the glossary

Source: U.S. state WARN Act disclosures for TX; dates and worker counts are as published by each state. About this data and which states are tracked · Report a data problem

This employer filed at least one WARN Act notice in the last 24 months — a state-mandated advance announcement of a planned mass layoff or closure. A notice is an announcement, not a completed layoff, and it is not evidence of any link between the employer’s H-1B filings and its workforce plans.

Compare Georgia-Pacific Gypsum LLC with another sponsor
Side-by-side view of KPIs, outcomes, top breakdowns and yearly trend.
Popular comparisons
Explore by rank
Pre-built leaderboards for the most-asked questions.